1200°C High Temperature Muffle Furnace
This box-type furnace can reach a maximum temperature of 1200°C. It features a double-shell structure with an air-cooling system. The furnace chamber is constructed of high-purity alumina fiber to minimize energy loss. The inner chamber surface is coated with a high-temperature alumina coating to improve reflectivity and heating efficiency, extending the instrument's lifespan. It also includes overheat and burnout protection. The side-opening furnace door facilitates sample placement and removal. The furnace chamber is equipped with ventilation ports for use in an inert atmosphere. Heating on three sides ensures a fast heating rate and a uniform temperature field.
Product Parameters:
·Maximum operating temperature: 1200°C (<0.5h)
·Continuous operating temperature: ≤1100°C
·Recommended heating rate: ≤10°C/min
·Heating element: Iron-chromium-aluminum alloy wire or Kanthal resistance wire
·Thermocouple: Type K
·Temperature control accuracy: ±1°C
·Temperature control method: Includes an intelligent temperature controller with PID control and auto-tuning, intelligently controlled
·30-50 programmable control levels, with over-temperature and burnout alarms
·Certification standards and core components: ISO9001, CE, and other certifications
·Core components include Chint and Schneider electrical components, UL-certified wire and cable, and Japanese, Yuden, and Eurofins instruments.
| Product Model | Power | Heating zone space | Voltage | Furnace size | Dimensions | Weight |
| XSL1100-1.3L | 1.3 KW | 1.3L | 220V | W100mm*H100mm*D130mm | 270mm*340mm*430mm | About 15KG |
| XSL1200-4L | 2.6 KW | 4L | 220V | W150mm*H150mm*D180mm | 320mm*400mm*570mm | About 28KG |
| XSL1200-7.2L | 3.6 KW | 7.2L | 220V | W200mm*H120mm*D300mm | 500mm*550mm*560mm | About 47KG |
| XSL1200-7.6L | 7.6 KW | 27L | 220V | W300mm*H300mm*D300mm | 650mm*580mm*890mm | About 70.5KG |
| XSL1200-12L | 4 KW | 12L | 220V | W200mm*H200mm*D300mm | 520mm*570mm*690mm | About 55KG |
| XSL1200-36L | 10KW | 36L | 380V | W300mm*H300mm*D400mm | 620mm*750mm*950mm | About 85KG |

-
A 20-tonne Acheson graphitization furnace can hold full power for 24 to 40 hours and then need five to seven days of cooling before anyone opens it. Peak temperature is the headline number, but cost per tonne is decided by three quieter things: the furnace type, the condition of the insulation, and the shape of the power profile. Two shops running the same 2800 °C schedule can differ by 30 percent in kilowatt-hours per tonne. The gap is usually not the transformer. It is compressed graphite fel...




English
Español
عربى