1000°C Large Diameter Swing Tube Furnace
This device is an extended, single-temperature zone, large-diameter swing tube furnace capable of reaching a maximum temperature of 1000°C. It features a double-shell structure with an air-cooling system. The furnace chamber is constructed of high-purity alumina fiber to minimize energy loss. The furnace tubes are made of 310S stainless steel, with diameters ranging from 50 to 200mm (customizable). They are heat-resistant to 1000°C and exhibit excellent ductility. The furnace body can swing from -30° to +30°. The circuit control system and the furnace's swing system are independently controlled, enabling integrated operation. Swinging improves melt uniformity and refines crystals, making it widely used in the preparation of thermoelectric materials.
Product Parameters:
· Rated Voltage: 220V 50/60Hz
· Rated Power: 15kW
· Maximum Operating Temperature: 1000°C (<0.5h)
· Continuous Operating Temperature: ≤900°C
· Recommended Heating Rate: ≤10°C/min
· Heating Element: Iron-chromium-aluminum alloy wire 0Cr21Al6Nb
· Heating Zone Length: Customizable
· Thermocouple: Type K (3 pieces)
· Furnace Tube Diameter: 50-200mm (Customizable)
· Temperature Control Accuracy: ±1°C
· Temperature Control Method: Includes a Yudian intelligent temperature controller with PID control and auto-tuning, intelligent 30-50 programmable control, and over-temperature and burnout alarms.
· Certification Standards and Core Components: ISO9001 and CE Certification
· Core Components include Chint or Schneider electrical components, UL-certified wire and cable, Japanese conductive materials, and Yudian and Eurotherm instrumentation.
· Furnace body can swing from -30° to +30°.
| Specifications | Maximum temperature | Heating zone length | Quartz tube size | Rated power | Rated voltage | Dimensions | Weight |
| YBL1200 | 1200℃(<0.5 h) | 200mm | Φ25*600mm | 1.5KW | 220V | 730mm*330mm*440mm | About 21KG |
| Φ50*600mm | |||||||
| YBL1200 - II | 1200℃(<0.5 h) | Dual temperature zones 100mm + 100mm | Φ25*600mm | 1.5KW | 220V | 730mm*330mm*440mm | About 21KG |
| Φ50*600mm |

-
A 20-tonne Acheson graphitization furnace can hold full power for 24 to 40 hours and then need five to seven days of cooling before anyone opens it. Peak temperature is the headline number, but cost per tonne is decided by three quieter things: the furnace type, the condition of the insulation, and the shape of the power profile. Two shops running the same 2800 °C schedule can differ by 30 percent in kilowatt-hours per tonne. The gap is usually not the transformer. It is compressed graphite fel...




English
Español
عربى